Transparent Image
Transparent Image
Civil Explosives

Civil Explosives - Health and safety - Step Four: Setting Minimal Acceptable Standards

Our safety management system documentation (every company standard and operating procedure) was reviewed and, where necessary, amended or re-written to reflect the revised risk potential and method of risk treatment. In order to ensure that, as a minimal, u-Safe complied with the various state statutory requirements, a "statutory compliance matrix" was developed, comparing u-Safe documentation against the various state legislative requirements. The u-Safe documentation was approved by the MAXAM Management team and released as a “Controlled Document.”




Fundación Maxam

Last update 2012.05.18
 
Contact   |   Site map   |   Legal Note   |   .